
Ørsted tax final opinion strengthens UK claim over offshore wind profits
An arbitration commission has concluded that Walney Extension and Hornsea 1 should be taxed primarily in the UK over their operating

An arbitration commission has concluded that Walney Extension and Hornsea 1 should be taxed primarily in the UK over their operating

Draft rules would require new ground-mounted solar and onshore wind plants commissioned after 1 July 2027 to install co-located storage equal

The Subsidy Advice Unit found the central case for Contracts for Difference sound, but said DESNZ should strengthen its analysis of

A coalition of unions, ports and business groups says some of NESO’s six possible energy pathways could substantially reduce Scotland’s offshore

Ørsted and Nuveen Infrastructure have commissioned the 913 MW Borkum Riffgrund 3 project in the German North Sea. The project was

Europe installed 8.8 GW of wind capacity in the first half of 2026, 30% more than a year earlier, with the

The Scottish government has awarded £861,000 to three programmes covering technical training, paid engineering placements and career transitions. The initiatives could

Seaway7 is preparing to install 54 pin piles supporting the 18 jacket foundations at the 1.1 GW Inch Cape offshore wind

Dajin Heavy Industry and Haventus will examine using the port of Ardersier for foundation storage, assembly, marshalling and transport. The memorandum

Arenko will operate and optimise Ørsted’s 300MW/600MWh Iceni battery using its Nimbus software platform. The two-hour battery will share transmission infrastructure





